View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Architecture Risk Storming | ![]() Decision Making Constraint Analysis | ![]() Facilitation Decision Jam | ![]() Decision Making Pre-Mortem |
|---|---|---|---|---|
Purposedifferent | Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog. | When an initiative stalls, the limit often lies not in the idea but in hard or soft boundary conditions. Constraint Analysis separates these limits and shows which of them can actually be shaped. | When a decision is stuck, Decision Jam loosens the knot through structured separation of problem, idea, and selection. The format creates movement without jumping prematurely at the first seemingly elegant answer. | In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures. |
Complexitysame | Low | Low | Low | Low |
Timedifferent | 60-90 min | 30-90 min | 60-90 min | 20–45 min |
Participantsdifferent | 4-12 | 2-8 | 4-10 | Small cross-functional group |
Formatdifferent | Workshop | Workshop + async | Workshop | Workshop |
Outputdifferent | Annotated Diagram, Prioritized Risk List, Action Backlog | Constraint List, Hard/Soft Classification, Option Impact Notes, Decision Boundaries | Problem Cluster, Prioritized Challenge, Experiment | Risk list, Mitigation plan, Assumption log |
Tagsno overlap | RiskArchitectureWorkshopValidation | ConstraintsDecisionPlanningOptions | FacilitationDecisionProblem solvingWorkshop | RiskDecisionFailurePlanning |



