methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Risk Storming.
Architecture
Risk Storming
Paper illustration: scenarios and architectural decisions are connected to identified risks.
Architecture
ATAM (Architecture Tradeoff Analysis Method)
Paper illustration of RAID Log with a method-specific labelled workspace.
Delivery
RAID Log
Architecture Communication Canvas method illustration showing its working structure
Architecture
Architecture Communication Canvas
Purposedifferent
Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog.ATAM helps teams weigh architecture decisions when quality goals compete. The team considers business goals, stakeholder expectations, and technical decisions together. The evaluation shows which risks need further investigation.Helps clarify scope, sequence, and delivery flow in concrete terms. It makes work, boundaries, and order steerable. The result is captured as a RAID Log and a source for status reporting.The Architecture Communication Canvas plans architecture communication so the right people receive the right message. The method turns technical complexity into deliberate communication design.
Complexitydifferent
LowHighLowMedium
Timedifferent
60-90 minSeveral meetings plus preparation and analysis; total effort depends on scope30 min Setup, dann laufend60-120 min
Participantsdifferent
4-12Evaluation team, architects, and relevant stakeholders1-3 maintaining, briefing for everyone2-8
Formatdifferent
WorkshopWorkshop + asyncAsyncWorkshop + async
Outputdifferent
Annotated Diagram, Prioritized Risk List, Action BacklogPrioritized quality scenarios in a utility tree, Architecture risks with reasoning and assumptions, Sensitivity and trade-off points, Findings report with open investigationsRAID Log, Status Report SourceCommunication Canvas, Stakeholder Messages, Architecture Communication Plan
Tagsno overlap
RiskArchitectureWorkshopValidation
ArchitectureQualityRiskTradeoffsStakeholders
RiskTrackingStakeholdersGovernance
ArchitectureCommunicationStakeholdersCanvas
Add more methods