View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Architecture Risk Storming | ![]() Architecture Architecture Decision Record | ![]() Growth A/B Testing | ![]() Product Discovery Experiment Canvas |
|---|---|---|---|---|
Purposedifferent | Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog. | An ADR permanently records an architecture decision with context, trade-offs, and consequence. It creates continuity for later changes because the decision path stays traceable. | When two variants compete, discussions quickly decide by taste rather than effect. A/B Testing checks behavior under controlled conditions and separates real improvement from chance or expectation effects. | When experiments become unreadable after the fact, it arranges hypothesis, signal, and learning goal on a single canvas. It separates problem, assumption, solution, and evidence. The result is captured as a Completed Experiment Canvas and a Success Metric. |
Complexitydifferent | Low | Low | High | Low |
Timedifferent | 60-90 min | 15-45 min | 1-4 Wochen | 30-60 min |
Participantsdifferent | 4-12 | 1-3 | 1-6 | 1-5 |
Formatdifferent | Workshop | Async | Async | Workshop + async |
Outputdifferent | Annotated Diagram, Prioritized Risk List, Action Backlog | ADR File, Decision Log, Rationale | Experiment results, Decision log, Learning summary | Completed Experiment Canvas, Success Metric |
Tagsno overlap | RiskArchitectureWorkshopValidation | ArchitectureRationaleDocumentationGovernance | ExperimentsGrowthAnalyticsValidation | ExperimentsValidationDiscoveryHypothesis |



