methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of a calibrated five-by-five risk matrix with response cards.
Decision Making
Risk Matrix
Paper illustration for Risk Storming.
Architecture
Risk Storming
Paper illustration of Five-Minute VC Check with its method-specific working model.
Business Strategy
5-Minuten VC-Check
Design sheets and interface cards connect to jointly written pseudocode with highlighted unresolved questions.
Architecture
ARID (Active Reviews for Intermediate Designs)
Purposedifferent
When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List.Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog.The 5-Minute VC Check clarifies opportunities and strategic options at the earliest idea stage. It compares problem quality, customer willingness to pay, alternatives, differentiation, and market potential, and captures the result as a VC-check note, go/sharpen/park decision, and risk list.ARID examines how well developers can work with a technical design. It focuses on a part of the system that can still be revised, between the architecture overview and the detailed specification.
Complexitydifferent
LowLowLowMedium
Timedifferent
30-60 min60-90 min5-15 min2–4 h review as a planning range; preparation and evaluation additional
Participantsdifferent
3-104-121-5Designers, developers as users, and facilitation
Formatdifferent
Workshop + asyncWorkshopWorkshop + asyncWorkshop + async
Outputdifferent
Risk Matrix, Top Risk ListAnnotated Diagram, Prioritized Risk List, Action BacklogVC-check note, Go/sharpen/park decision, Risk and assumption list, Next validation stepPrioritized development tasks, Jointly produced code or pseudocode, Observed difficulties and open design questions, Proposed design revisions
Tagsno overlap
RiskDecisionPrioritizationAssessment
RiskArchitectureWorkshopValidation
StartupValidationCompetition
ArchitectureEngineeringFeedbackValidationTasks
Add more methods