View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Decision Making Risk Matrix | ![]() Decision Making Pre-Mortem | ![]() Innovation Design Sprint | ![]() Decision Making Constraint Analysis |
|---|---|---|---|---|
Purposedifferent | When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List. | In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures. | When the product question is unclear and time pressure is high, the method takes a team from an open idea to a testable solution. It connects problem understanding, decision, and learning in one compact format, lowering the risk of spending a lot of energy on a mere guess. | When an initiative stalls, the limit often lies not in the idea but in hard or soft boundary conditions. Constraint Analysis separates these limits and shows which of them can actually be shaped. |
Complexitydifferent | Low | Low | High | Low |
Timedifferent | 30-60 min | 20–45 min | 4-5 Tage | 30-90 min |
Participantsdifferent | 3-10 | Small cross-functional group | 5-8 | 2-8 |
Formatdifferent | Workshop + async | Workshop | Workshop | Workshop + async |
Outputdifferent | Risk Matrix, Top Risk List | Risk list, Mitigation plan, Assumption log | Prototype, Test Findings, Decision Rationale | Constraint List, Hard/Soft Classification, Option Impact Notes, Decision Boundaries |
Tagsno overlap | RiskDecisionPrioritizationAssessment | RiskDecisionFailurePlanning | Design sprintPrototypeValidationInnovation | ConstraintsDecisionPlanningOptions |



