View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Decision Making Risk Matrix | ![]() Decision Making Pre-Mortem | ![]() Delivery Cost of Delay | ![]() Decision Making Assumption Surfacing |
|---|---|---|---|---|
Purposedifferent | When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List. | In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures. | Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence. | Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it. |
Complexitydifferent | Low | Low | High | Low |
Timedifferent | 30-60 min | 20–45 min | 90-180 min | 45-90 min |
Participantsdifferent | 3-10 | Small cross-functional group | 3-8 | 2-8 |
Formatdifferent | Workshop + async | Workshop | Workshop | Workshop + async |
Outputdifferent | Risk Matrix, Top Risk List | Risk list, Mitigation plan, Assumption log | CoD Table, Prioritization Sequence | Assumption List, Critical Assumptions, Learning Plan |
Tags1 shared | RiskDecisionPrioritizationAssessment | RiskDecisionFailurePlanning | PrioritizationDeliveryEconomicsDecision | AssumptionsRiskDecisionDiscovery |



