methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of a calibrated five-by-five risk matrix with response cards.
Decision Making
Risk Matrix
A hypothetical failure makes concrete risks, signals, and fitting mitigations visible.
Decision Making
Pre-Mortem
Paper illustration for Constraint Analysis.
Decision Making
Constraint Analysis
Decision Tree method illustration showing its working structure
Decision Making
Decision Tree
Purposedifferent
When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List.In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures.When an initiative stalls, the limit often lies not in the idea but in hard or soft boundary conditions. Constraint Analysis separates these limits and shows which of them can actually be shaped.For decisions with follow-on paths and dependencies, a linear comparison is often not enough. A Decision Tree shows how options branch under conditions and which consequences hang on each branch.
Complexitydifferent
LowLowLowMedium
Timedifferent
30-60 min20–45 min30-90 min30-90 min
Participantsdifferent
3-10Small cross-functional group2-81-6
Formatdifferent
Workshop + asyncWorkshopWorkshop + asyncWorkshop + async
Outputdifferent
Risk Matrix, Top Risk ListRisk list, Mitigation plan, Assumption logConstraint List, Hard/Soft Classification, Option Impact Notes, Decision BoundariesDecision Tree, Option Map, Assumption List
Tags1 shared
RiskDecisionPrioritizationAssessment
RiskDecisionFailurePlanning
ConstraintsDecisionPlanningOptions
DecisionTreeOptions
Add more methods