methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of a calibrated five-by-five risk matrix with response cards.
Decision Making
Risk Matrix
A hypothetical failure makes concrete risks, signals, and fitting mitigations visible.
Decision Making
Pre-Mortem
A paper-based illustration representing arc42 with its core stages and visible working result.
Architecture
arc42
Paper illustration of two considered options leading to a decision record with a marked status and visible consequences.
Architecture
Architecture Decision Record
Purposedifferent
When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List.In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures.arc42 structures architecture knowledge so teams can document system, decisions, and risks consistently. The template builds a living understanding of the architecture instead of scattered notes.An ADR permanently records an architecture decision with context, trade-offs, and consequence. It creates continuity for later changes because the decision path stays traceable.
Complexitysame
LowLowLowLow
Timedifferent
30-60 min20–45 min1-2 Tage15-45 min
Participantsdifferent
3-10Small cross-functional group1-41-3
Formatdifferent
Workshop + asyncWorkshopWorkshop + asyncAsync
Outputdifferent
Risk Matrix, Top Risk ListRisk list, Mitigation plan, Assumption logArchitecture Document, Context View, Runtime View, Deployment ViewADR File, Decision Log, Rationale
Tagsno overlap
RiskDecisionPrioritizationAssessment
RiskDecisionFailurePlanning
ArchitectureDocumentationCommunication
ArchitectureRationaleDocumentationGovernance
Add more methods