methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of a calibrated five-by-five risk matrix with response cards.
Decision Making
Risk Matrix
Paper illustration for Kepner-Tregoe
Operations
Kepner-Tregoe
Paper illustration for Trade-off Analysis.
Decision Making
Trade-off Analysis
A 5 Whys working surface connects an observable problem with evidenced causes, marked uncertainty and concrete countermeasures with ownership.
Operations
5 Whys
Purposedifferent
When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List.For a disturbance that's hard to pin down, the method cleanly separates problem, cause, and decision. It reduces mixing when symptoms allow several interpretations.With limited resources, quality, speed, cost, and risk almost always compete with each other. Trade-off Analysis makes these tensions explicit and prevents decisions from producing hidden side effects.For a single, hard-to-explain deviation, the method exposes the causal chain behind the visible symptom. It keeps the cause open until a controllable condition emerges instead of a mere description.
Complexitydifferent
LowHighMediumLow
Timedifferent
30-60 min2-8 h45-120 min15-30 min
Participantsdifferent
3-102-82-82-6
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshop + asyncWorkshop
Outputdifferent
Risk Matrix, Top Risk ListProblem Analysis, Decision Analysis, Risk PlanTrade-off Matrix, Criteria List, Decision Rationale, Accepted DownsidesRoot cause notes, Countermeasures
Tagsno overlap
RiskDecisionPrioritizationAssessment
Problem solvingRoot causeDecisionOperations
TradeoffsDecisionCriteriaOptions
Root causeIncidentLeanProblem solving
Add more methods