methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of a calibrated five-by-five risk matrix with response cards.
Decision Making
Risk Matrix
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Paper illustration of an assumption matrix with prioritized test cards
Decision Making
Assumption Surfacing
Paper illustration of DIBB with its method-specific working model.
Product Strategy
DIBB
Purposedifferent
When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List.When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it.DIBB helps clarify target groups, value, goals, and priorities by making the logic behind a decision explicit. It captures results as a DIBB document, belief list, bet list, and learning report.
Complexitydifferent
LowMediumLowLow
Timedifferent
30-60 minOngoing45-90 min1-2 h
Participantsdifferent
3-102-122-82-8
Formatsame
Workshop + asyncWorkshop + asyncWorkshop + asyncWorkshop + async
Outputdifferent
Risk Matrix, Top Risk ListKanban board, WIP policies, Flow metricsAssumption List, Critical Assumptions, Learning PlanDIBB document, Belief list, Bet list, Learning report
Tagsno overlap
RiskDecisionPrioritizationAssessment
FlowVisual managementDelivery
AssumptionsRiskDecisionDiscovery
StrategyDecisionAssumptionsHypothesis
Add more methods