methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of a calibrated five-by-five risk matrix with response cards.
Decision Making
Risk Matrix
Paper illustration of the Force Field Analysis working structure.
Decision Making
Force Field Analysis
Paper illustration for Constraint Analysis.
Decision Making
Constraint Analysis
A hypothetical failure makes concrete risks, signals, and fitting mitigations visible.
Decision Making
Pre-Mortem
Purposedifferent
When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List.In change initiatives, supporting and restraining forces sit at the table at the same time. Force Field Analysis makes these tensions explicit and shows where change can be pushed forward by strengthening or relieving.When an initiative stalls, the limit often lies not in the idea but in hard or soft boundary conditions. Constraint Analysis separates these limits and shows which of them can actually be shaped.In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures.
Complexitysame
LowLowLowLow
Timedifferent
30-60 min45-90 min30-90 min20–45 min
Participantsdifferent
3-103-122-8Small cross-functional group
Formatdifferent
Workshop + asyncWorkshopWorkshop + asyncWorkshop
Outputdifferent
Risk Matrix, Top Risk ListForce Field Map, Change Levers, Risk NotesConstraint List, Hard/Soft Classification, Option Impact Notes, Decision BoundariesRisk list, Mitigation plan, Assumption log
Tags1 shared
RiskDecisionPrioritizationAssessment
ChangeDecisionStrategy
ConstraintsDecisionPlanningOptions
RiskDecisionFailurePlanning
Add more methods