View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Decision Making Risk Matrix | ![]() Operations Fault Tree Analysis | ![]() Operations Family Tree Analysis | ![]() Decision Making Assumption Surfacing |
|---|---|---|---|---|
Purposedifferent | When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List. | For a critical top event with several possible triggers, the method logically models failure paths. It makes visible which combinations of conditions can lead to damage. | For a series of incidents with a similar pattern, the method arranges individual events as branches of a common origin. It makes visible which conditions keep recurring. | Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it. |
Complexitydifferent | Low | High | Medium | Low |
Timedifferent | 30-60 min | 2-6 h | 2-4 h | 45-90 min |
Participantsdifferent | 3-10 | 3-8 | 2-6 | 2-8 |
Formatsame | Workshop + async | Workshop + async | Workshop + async | Workshop + async |
Outputdifferent | Risk Matrix, Top Risk List | Fault Tree, Critical Paths, Cause Hypotheses, Control Actions | Family Tree Diagram, Pattern Notes, Systemic Measures | Assumption List, Critical Assumptions, Learning Plan |
Tagsno overlap | RiskDecisionPrioritizationAssessment | RiskRoot causeSafety | Root causePatternsIncidentSystemic | AssumptionsRiskDecisionDiscovery |



