View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Decision Making Risk Matrix | ![]() Operations Family Tree Analysis | ![]() Operations MORT Analysis | ![]() Decision Making Assumption Surfacing |
|---|---|---|---|---|
Purposedifferent | When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List. | For a series of incidents with a similar pattern, the method arranges individual events as branches of a common origin. It makes visible which conditions keep recurring. | For a safety-relevant event or a system with high protection requirements, the method examines where controls failed. It exposes both technical and organizational gaps. | Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it. |
Complexitydifferent | Low | Medium | High | Low |
Timedifferent | 30-60 min | 2-4 h | Mehrere Tage bis Wochen | 45-90 min |
Participantsdifferent | 3-10 | 2-6 | 2-6 | 2-8 |
Formatsame | Workshop + async | Workshop + async | Workshop + async | Workshop + async |
Outputdifferent | Risk Matrix, Top Risk List | Family Tree Diagram, Pattern Notes, Systemic Measures | MORT Worksheets, Findings per Branch, Corrective Actions, Systemic Recommendations | Assumption List, Critical Assumptions, Learning Plan |
Tagsno overlap | RiskDecisionPrioritizationAssessment | Root causePatternsIncidentSystemic | Root causeSafetySystemicIncident | AssumptionsRiskDecisionDiscovery |



