methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of a calibrated five-by-five risk matrix with response cards.
Decision Making
Risk Matrix
Paper illustration of shared options, independently placed voting dots, and a highlighted shortlist.
Facilitation
Dot Voting
A hypothetical failure makes concrete risks, signals, and fitting mitigations visible.
Decision Making
Pre-Mortem
Paper illustration for Constraint Analysis.
Decision Making
Constraint Analysis
Purposedifferent
When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List.When a workshop has produced too many options and the group needs to condense quickly, dot voting makes preferences visible in a short time. It bundles individual votes into a solid signal for the next selection.In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures.When an initiative stalls, the limit often lies not in the idea but in hard or soft boundary conditions. Constraint Analysis separates these limits and shows which of them can actually be shaped.
Complexitysame
LowLowLowLow
Timedifferent
30-60 min5-15 min20–45 min30-90 min
Participantsdifferent
3-103-20Small cross-functional group2-8
Formatdifferent
Workshop + asyncWorkshopWorkshopWorkshop + async
Outputdifferent
Risk Matrix, Top Risk ListRanked list, Consensus signal, ShortlistRisk list, Mitigation plan, Assumption logConstraint List, Hard/Soft Classification, Option Impact Notes, Decision Boundaries
Tagsno overlap
RiskDecisionPrioritizationAssessment
FacilitationVotingConsensusPrioritization
RiskDecisionFailurePlanning
ConstraintsDecisionPlanningOptions
Add more methods