View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Decision Making Risk Matrix | ![]() Facilitation Dot Voting | ![]() Product Discovery Assumption Mapping | ![]() Growth A/B Testing |
|---|---|---|---|---|
Purposedifferent | When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List. | When a workshop has produced too many options and the group needs to condense quickly, dot voting makes preferences visible in a short time. It bundles individual votes into a solid signal for the next selection. | When assumptions still sit unordered in the room, it weighs uncertainty against leverage. It makes visible which hypotheses should be checked first. | When two variants compete, discussions quickly decide by taste rather than effect. A/B Testing checks behavior under controlled conditions and separates real improvement from chance or expectation effects. |
Complexitydifferent | Low | Low | Medium | High |
Timedifferent | 30-60 min | 5-15 min | 45-60 min | 1-4 Wochen |
Participantsdifferent | 3-10 | 3-20 | 2-8 | 1-6 |
Formatdifferent | Workshop + async | Workshop | Workshop + async | Async |
Outputdifferent | Risk Matrix, Top Risk List | Ranked list, Consensus signal, Shortlist | Assumption map, Test backlog, Risk ranking | Experiment results, Decision log, Learning summary |
Tagsno overlap | RiskDecisionPrioritizationAssessment | FacilitationVotingConsensusPrioritization | AssumptionsRiskExperimentsValidation | ExperimentsGrowthAnalyticsValidation |



