methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of a calibrated five-by-five risk matrix with response cards.
Decision Making
Risk Matrix
A paper-based illustration representing Design Sprint with its core stages and visible working result.
Innovation
Design Sprint
Paper illustration for Risk Storming.
Architecture
Risk Storming
Design sheets and interface cards connect to jointly written pseudocode with highlighted unresolved questions.
Architecture
ARID (Active Reviews for Intermediate Designs)
Purposedifferent
When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List.When the product question is unclear and time pressure is high, the method takes a team from an open idea to a testable solution. It connects problem understanding, decision, and learning in one compact format, lowering the risk of spending a lot of energy on a mere guess.Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog.ARID examines how well developers can work with a technical design. It focuses on a part of the system that can still be revised, between the architecture overview and the detailed specification.
Complexitydifferent
LowHighLowMedium
Timedifferent
30-60 min4-5 Tage60-90 min2–4 h review as a planning range; preparation and evaluation additional
Participantsdifferent
3-105-84-12Designers, developers as users, and facilitation
Formatdifferent
Workshop + asyncWorkshopWorkshopWorkshop + async
Outputdifferent
Risk Matrix, Top Risk ListPrototype, Test Findings, Decision RationaleAnnotated Diagram, Prioritized Risk List, Action BacklogPrioritized development tasks, Jointly produced code or pseudocode, Observed difficulties and open design questions, Proposed design revisions
Tagsno overlap
RiskDecisionPrioritizationAssessment
Design sprintPrototypeValidationInnovation
RiskArchitectureWorkshopValidation
ArchitectureEngineeringFeedbackValidationTasks
Add more methods