View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Decision Making Risk Matrix | ![]() Innovation Design Sprint | ![]() Decision Making Assumption Surfacing | ![]() Product Discovery Riskiest Assumption Test |
|---|---|---|---|---|
Purposedifferent | When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List. | When the product question is unclear and time pressure is high, the method takes a team from an open idea to a testable solution. It connects problem understanding, decision, and learning in one compact format, lowering the risk of spending a lot of energy on a mere guess. | Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it. | When an idea hinges on one critical unknown, it prioritizes testing that exact piece of uncertainty first. It separates problem, assumption, solution, and evidence. The result is captured as a prioritized list of assumptions, a test plan, and a result report. |
Complexitydifferent | Low | High | Low | Medium |
Timedifferent | 30-60 min | 4-5 Tage | 45-90 min | 1-2 Wochen pro Iteration |
Participantsdifferent | 3-10 | 5-8 | 2-8 | 2-6 |
Formatdifferent | Workshop + async | Workshop | Workshop + async | Workshop + async |
Outputdifferent | Risk Matrix, Top Risk List | Prototype, Test Findings, Decision Rationale | Assumption List, Critical Assumptions, Learning Plan | Prioritized Assumption List, Test Plan, Results Report |
Tagsno overlap | RiskDecisionPrioritizationAssessment | Design sprintPrototypeValidationInnovation | AssumptionsRiskDecisionDiscovery | ExperimentsValidationDiscoveryAssumptions |