View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Decision Making Risk Matrix | ![]() Innovation Design Sprint | ![]() Decision Making Assumption Surfacing | ![]() Product Discovery Assumption Mapping |
|---|---|---|---|---|
Purposedifferent | When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List. | When the product question is unclear and time pressure is high, the method takes a team from an open idea to a testable solution. It connects problem understanding, decision, and learning in one compact format, lowering the risk of spending a lot of energy on a mere guess. | Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it. | When assumptions still sit unordered in the room, it weighs uncertainty against leverage. It makes visible which hypotheses should be checked first. |
Complexitydifferent | Low | High | Low | Medium |
Timedifferent | 30-60 min | 4-5 Tage | 45-90 min | 45-60 min |
Participantsdifferent | 3-10 | 5-8 | 2-8 | 2-8 |
Formatdifferent | Workshop + async | Workshop | Workshop + async | Workshop + async |
Outputdifferent | Risk Matrix, Top Risk List | Prototype, Test Findings, Decision Rationale | Assumption List, Critical Assumptions, Learning Plan | Assumption map, Test backlog, Risk ranking |
Tagsno overlap | RiskDecisionPrioritizationAssessment | Design sprintPrototypeValidationInnovation | AssumptionsRiskDecisionDiscovery | AssumptionsRiskExperimentsValidation |