methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of a calibrated five-by-five risk matrix with response cards.
Decision Making
Risk Matrix
Paper illustration of the Lightning Decision Jam working structure.
Facilitation
Decision Jam
Paper illustration for Kepner-Tregoe
Operations
Kepner-Tregoe
A 5 Whys working surface connects an observable problem with evidenced causes, marked uncertainty and concrete countermeasures with ownership.
Operations
5 Whys
Purposedifferent
When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List.When a decision is stuck, Decision Jam loosens the knot through structured separation of problem, idea, and selection. The format creates movement without jumping prematurely at the first seemingly elegant answer.For a disturbance that's hard to pin down, the method cleanly separates problem, cause, and decision. It reduces mixing when symptoms allow several interpretations.For a single, hard-to-explain deviation, the method exposes the causal chain behind the visible symptom. It keeps the cause open until a controllable condition emerges instead of a mere description.
Complexitydifferent
LowLowHighLow
Timedifferent
30-60 min60-90 min2-8 h15-30 min
Participantsdifferent
3-104-102-82-6
Formatdifferent
Workshop + asyncWorkshopWorkshop + asyncWorkshop
Outputdifferent
Risk Matrix, Top Risk ListProblem Cluster, Prioritized Challenge, ExperimentProblem Analysis, Decision Analysis, Risk PlanRoot cause notes, Countermeasures
Tagsno overlap
RiskDecisionPrioritizationAssessment
FacilitationDecisionProblem solvingWorkshop
Problem solvingRoot causeDecisionOperations
Root causeIncidentLeanProblem solving
Add more methods