methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of a calibrated five-by-five risk matrix with response cards.
Decision Making
Risk Matrix
Paper illustration of the Lightning Decision Jam working structure.
Facilitation
Decision Jam
Paper illustration for Failure Mode and Effects Analysis
Operations
Failure Mode and Effects Analysis
Paper illustration for Kepner-Tregoe
Operations
Kepner-Tregoe
Purposedifferent
When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List.When a decision is stuck, Decision Jam loosens the knot through structured separation of problem, idea, and selection. The format creates movement without jumping prematurely at the first seemingly elegant answer.For a process, product, or service with noticeable failure risks, the method assesses possible failure modes in advance. It directs attention to combinations of occurrence, effect, and detectability.For a disturbance that's hard to pin down, the method cleanly separates problem, cause, and decision. It reduces mixing when symptoms allow several interpretations.
Complexitydifferent
LowLowHighHigh
Timedifferent
30-60 min60-90 min2-6 h2-8 h
Participantsdifferent
3-104-103-102-8
Formatdifferent
Workshop + asyncWorkshopWorkshopWorkshop + async
Outputdifferent
Risk Matrix, Top Risk ListProblem Cluster, Prioritized Challenge, ExperimentFMEA Table, Risk Priority, Mitigation ActionsProblem Analysis, Decision Analysis, Risk Plan
Tagsno overlap
RiskDecisionPrioritizationAssessment
FacilitationDecisionProblem solvingWorkshop
RiskQualityOperationsRoot cause
Problem solvingRoot causeDecisionOperations
Add more methods