View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Decision Making Risk Matrix | ![]() Delivery Cost of Delay | ![]() Product Discovery Test Card | ![]() Product Discovery Assumption Mapping |
|---|---|---|---|---|
Purposedifferent | When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List. | Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence. | The Test Card turns a critical assumption into a testable claim and specifies in advance which result counts as success. | When assumptions still sit unordered in the room, it weighs uncertainty against leverage. It makes visible which hypotheses should be checked first. |
Complexitydifferent | Low | High | Low | Medium |
Timedifferent | 30-60 min | 90-180 min | 20-35 min | 45-60 min |
Participantsdifferent | 3-10 | 3-8 | 1-5 | 2-8 |
Formatdifferent | Workshop + async | Workshop | Workshop + async | Workshop + async |
Outputdifferent | Risk Matrix, Top Risk List | CoD Table, Prioritization Sequence | Test Card with a pre-set threshold | Assumption map, Test backlog, Risk ranking |
Tagsno overlap | RiskDecisionPrioritizationAssessment | PrioritizationDeliveryEconomicsDecision | ExperimentsValidationDiscoveryHypothesis | AssumptionsRiskExperimentsValidation |



