View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Decision Making Risk Matrix | ![]() Decision Making Constraint Analysis | ![]() Decision Making Trade-off Analysis | ![]() Decision Making Pre-Mortem |
|---|---|---|---|---|
Purposedifferent | When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List. | When an initiative stalls, the limit often lies not in the idea but in hard or soft boundary conditions. Constraint Analysis separates these limits and shows which of them can actually be shaped. | With limited resources, quality, speed, cost, and risk almost always compete with each other. Trade-off Analysis makes these tensions explicit and prevents decisions from producing hidden side effects. | In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures. |
Complexitydifferent | Low | Low | Medium | Low |
Timedifferent | 30-60 min | 30-90 min | 45-120 min | 20–45 min |
Participantsdifferent | 3-10 | 2-8 | 2-8 | Small cross-functional group |
Formatdifferent | Workshop + async | Workshop + async | Workshop + async | Workshop |
Outputdifferent | Risk Matrix, Top Risk List | Constraint List, Hard/Soft Classification, Option Impact Notes, Decision Boundaries | Trade-off Matrix, Criteria List, Decision Rationale, Accepted Downsides | Risk list, Mitigation plan, Assumption log |
Tags1 shared | RiskDecisionPrioritizationAssessment | ConstraintsDecisionPlanningOptions | TradeoffsDecisionCriteriaOptions | RiskDecisionFailurePlanning |



