methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of a calibrated five-by-five risk matrix with response cards.
Decision Making
Risk Matrix
Paper illustration for Constraint Analysis.
Decision Making
Constraint Analysis
A hypothetical failure makes concrete risks, signals, and fitting mitigations visible.
Decision Making
Pre-Mortem
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Purposedifferent
When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List.When an initiative stalls, the limit often lies not in the idea but in hard or soft boundary conditions. Constraint Analysis separates these limits and shows which of them can actually be shaped.In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures.Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.
Complexitydifferent
LowLowLowHigh
Timedifferent
30-60 min30-90 min20–45 min90-180 min
Participantsdifferent
3-102-8Small cross-functional group3-8
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshopWorkshop
Outputdifferent
Risk Matrix, Top Risk ListConstraint List, Hard/Soft Classification, Option Impact Notes, Decision BoundariesRisk list, Mitigation plan, Assumption logCoD Table, Prioritization Sequence
Tags1 shared
RiskDecisionPrioritizationAssessment
ConstraintsDecisionPlanningOptions
RiskDecisionFailurePlanning
PrioritizationDeliveryEconomicsDecision
Add more methods