methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of a calibrated five-by-five risk matrix with response cards.
Decision Making
Risk Matrix
Paper illustration for Constraint Analysis.
Decision Making
Constraint Analysis
A 5 Whys working surface connects an observable problem with evidenced causes, marked uncertainty and concrete countermeasures with ownership.
Operations
5 Whys
A hypothetical failure makes concrete risks, signals, and fitting mitigations visible.
Decision Making
Pre-Mortem
Purposedifferent
When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List.When an initiative stalls, the limit often lies not in the idea but in hard or soft boundary conditions. Constraint Analysis separates these limits and shows which of them can actually be shaped.For a single, hard-to-explain deviation, the method exposes the causal chain behind the visible symptom. It keeps the cause open until a controllable condition emerges instead of a mere description.In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures.
Complexitysame
LowLowLowLow
Timedifferent
30-60 min30-90 min15-30 min20–45 min
Participantsdifferent
3-102-82-6Small cross-functional group
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshopWorkshop
Outputdifferent
Risk Matrix, Top Risk ListConstraint List, Hard/Soft Classification, Option Impact Notes, Decision BoundariesRoot cause notes, CountermeasuresRisk list, Mitigation plan, Assumption log
Tagsno overlap
RiskDecisionPrioritizationAssessment
ConstraintsDecisionPlanningOptions
Root causeIncidentLeanProblem solving
RiskDecisionFailurePlanning
Add more methods