View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Decision Making Risk Matrix | ![]() Operations Change Analysis | ![]() Operations Fault Tree Analysis | ![]() Decision Making Assumption Surfacing |
|---|---|---|---|---|
Purposedifferent | When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List. | For a deviation after a change, the method isolates the influence of the altered condition. It narrows down which differences are relevant and which are just accompanying noise. | For a critical top event with several possible triggers, the method logically models failure paths. It makes visible which combinations of conditions can lead to damage. | Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it. |
Complexitydifferent | Low | Medium | High | Low |
Timedifferent | 30-60 min | 45-120 min | 2-6 h | 45-90 min |
Participantsdifferent | 3-10 | 2-6 | 3-8 | 2-8 |
Formatsame | Workshop + async | Workshop + async | Workshop + async | Workshop + async |
Outputdifferent | Risk Matrix, Top Risk List | Change Matrix, Cause Hypotheses, Validation Questions, Action List | Fault Tree, Critical Paths, Cause Hypotheses, Control Actions | Assumption List, Critical Assumptions, Learning Plan |
Tagsno overlap | RiskDecisionPrioritizationAssessment | ChangeRoot causeTroubleshootingComparison | RiskRoot causeSafety | AssumptionsRiskDecisionDiscovery |



