View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Decision Making Risk Matrix | ![]() Operations Causal Factor Analysis | ![]() Decision Making Assumption Surfacing | ![]() Delivery Cost of Delay |
|---|---|---|---|---|
Purposedifferent | When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List. | For an event with a complicated course, the method breaks down the contributing factors along the timeline. It shows how conditions, decisions, and reactions together produce a course of events. | Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it. | Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence. |
Complexitydifferent | Low | High | Low | High |
Timedifferent | 30-60 min | 2-6 h | 45-90 min | 90-180 min |
Participantsdifferent | 3-10 | 3-10 | 2-8 | 3-8 |
Formatdifferent | Workshop + async | Workshop + async | Workshop + async | Workshop |
Outputdifferent | Risk Matrix, Top Risk List | Event Timeline, Causal Factor Chart, Cause List, Corrective Actions | Assumption List, Critical Assumptions, Learning Plan | CoD Table, Prioritization Sequence |
Tagsno overlap | RiskDecisionPrioritizationAssessment | CausalityIncidentRoot causeTimeline | AssumptionsRiskDecisionDiscovery | PrioritizationDeliveryEconomicsDecision |



