Criterion
Paper illustration of a calibrated five-by-five risk matrix with response cards.
Decision Making
Risk Matrix
Paper illustration of an assumption matrix with prioritized test cards
Decision Making
Assumption Surfacing
Paper illustration of Specification by Example with a method-specific labelled workspace.
Agile
Specification by Example
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Purposedifferent
When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List.Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it.When business rules need to become precise, it ties language, example, and test together. It sorts work by value, risk, and delivery ability. The result is captured as an Example Table and Acceptance Tests.Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.
Complexitydifferent
LowLowMediumHigh
Timedifferent
30-60 min45-90 min60-90 min pro Feature90-180 min
Participantsdifferent
3-102-83-63-8
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshopWorkshop
Outputdifferent
Risk Matrix, Top Risk ListAssumption List, Critical Assumptions, Learning PlanExample Table, Acceptance TestsCoD Table, Prioritization Sequence
Tagsno overlap
RiskDecisionPrioritizationAssessment
AssumptionsRiskDecisionDiscovery
AgileRequirementsExamplesBehavior-Driven Development
PrioritizationDeliveryEconomicsDecision