View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Decision Making Risk Matrix | ![]() Product Discovery Assumption Mapping | ![]() Architecture Risk Storming | ![]() Delivery Cost of Delay |
|---|---|---|---|---|
Purposedifferent | When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List. | When assumptions still sit unordered in the room, it weighs uncertainty against leverage. It makes visible which hypotheses should be checked first. | Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog. | Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence. |
Complexitydifferent | Low | Medium | Low | High |
Timedifferent | 30-60 min | 45-60 min | 60-90 min | 90-180 min |
Participantsdifferent | 3-10 | 2-8 | 4-12 | 3-8 |
Formatdifferent | Workshop + async | Workshop + async | Workshop | Workshop |
Outputdifferent | Risk Matrix, Top Risk List | Assumption map, Test backlog, Risk ranking | Annotated Diagram, Prioritized Risk List, Action Backlog | CoD Table, Prioritization Sequence |
Tagsno overlap | RiskDecisionPrioritizationAssessment | AssumptionsRiskExperimentsValidation | RiskArchitectureWorkshopValidation | PrioritizationDeliveryEconomicsDecision |



