View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Decision Making Risk Matrix | ![]() Product Discovery Assumption Mapping | ![]() Operations MORT Analysis | ![]() Operations Fault Tree Analysis |
|---|---|---|---|---|
Purposedifferent | When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List. | When assumptions still sit unordered in the room, it weighs uncertainty against leverage. It makes visible which hypotheses should be checked first. | For a safety-relevant event or a system with high protection requirements, the method examines where controls failed. It exposes both technical and organizational gaps. | For a critical top event with several possible triggers, the method logically models failure paths. It makes visible which combinations of conditions can lead to damage. |
Complexitydifferent | Low | Medium | High | High |
Timedifferent | 30-60 min | 45-60 min | Mehrere Tage bis Wochen | 2-6 h |
Participantsdifferent | 3-10 | 2-8 | 2-6 | 3-8 |
Formatsame | Workshop + async | Workshop + async | Workshop + async | Workshop + async |
Outputdifferent | Risk Matrix, Top Risk List | Assumption map, Test backlog, Risk ranking | MORT Worksheets, Findings per Branch, Corrective Actions, Systemic Recommendations | Fault Tree, Critical Paths, Cause Hypotheses, Control Actions |
Tagsno overlap | RiskDecisionPrioritizationAssessment | AssumptionsRiskExperimentsValidation | Root causeSafetySystemicIncident | RiskRoot causeSafety |



