methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of a calibrated five-by-five risk matrix with response cards.
Decision Making
Risk Matrix
A paper-based illustration representing arc42 with its core stages and visible working result.
Architecture
arc42
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
A paper-based illustration representing C4 Model with its core stages and visible working result.
Architecture
C4 Model
Purposedifferent
When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List.arc42 structures architecture knowledge so teams can document system, decisions, and risks consistently. The template builds a living understanding of the architecture instead of scattered notes.Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.The C4 Model makes a system legible across several resolution levels, from context down to code. It suits situations where different audiences need to understand the same architecture from different altitudes.
Complexitydifferent
LowLowHighLow
Timedifferent
30-60 min1-2 Tage90-180 min1-4 h
Participantsdifferent
3-101-43-81-5
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshopWorkshop + async
Outputdifferent
Risk Matrix, Top Risk ListArchitecture Document, Context View, Runtime View, Deployment ViewCoD Table, Prioritization SequenceContext Diagram, Container Diagram, Component Diagram
Tagsno overlap
RiskDecisionPrioritizationAssessment
ArchitectureDocumentationCommunication
PrioritizationDeliveryEconomicsDecision
ArchitectureCommunicationVisualization
Add more methods