View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Systems Thinking Rich Picture | ![]() Operations Scatter Diagram | ![]() Operations A3 Problem Solving | ![]() Operations Failure Mode and Effects Analysis |
|---|---|---|---|---|
Purposedifferent | A Rich Picture brings an unclear situation onto a shared drawing. It captures actors, tensions, information flows, and blind spots before the team jumps to solutions too early. | When the question is whether two measures are related, the method makes patterns in the data picture visible. It separates felt correlations from relationships that actually show up in the data. | For a complex deviation with several people involved, the method bundles problem, analysis, and decision onto one page. It creates a shared working space where causes, countermeasures, and follow-up fit together. | For a process, product, or service with noticeable failure risks, the method assesses possible failure modes in advance. It directs attention to combinations of occurrence, effect, and detectability. |
Complexitydifferent | Low | Low | Medium | High |
Timedifferent | 30-90 min | 30-90 min | 45-90 min | 2-6 h |
Participantsdifferent | 2-10 | 1-4 | 2-5 | 3-10 |
Formatdifferent | Workshop | Workshop + async | Workshop + async | Workshop |
Outputdifferent | Rich Picture, Problem Framing Notes | Scatter Plot, Korrelationsnotiz, Hypothesenliste | A3 Report, Action Plan, Root Cause Analysis | FMEA Table, Risk Priority, Mitigation Actions |
Tagsno overlap | Systems thinkingSoft systemsFramingVisualization | Root causeQualityVisualization | LeanProblem solvingCoachingOperations | RiskQualityOperationsRoot cause |



