View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Systems Thinking Rich Picture | ![]() Facilitation Expectation Mapping | ![]() Team Design Team Topologies Interaction Modes | ![]() Facilitation Team Charter |
|---|---|---|---|---|
Purposedifferent | A Rich Picture brings an unclear situation onto a shared drawing. It captures actors, tensions, information flows, and blind spots before the team jumps to solutions too early. | When roles, interfaces, or projects fail because of differing expectations, Expectation Mapping surfaces these differences. It shows what each side takes for granted and where the pictures diverge. | When several teams collaborate repeatedly, it describes the right interaction mode for each interface between them. It clarifies responsibility, interaction, and load between teams. The result is captured as an interaction heat map and pairwise agreements. | When a team is starting fresh or working past each other, Team Charter clarifies the shared working basis. It visibly sets out how collaboration, decision paths, and mutual conduct should work day to day. |
Complexitydifferent | Low | Low | Medium | Medium |
Timedifferent | 30-90 min | 45-90 min | Half day | 2-4 h |
Participantsdifferent | 2-10 | 3-12 | Team-Leads plus Architecture | 3-12 |
Formatsame | Workshop | Workshop | Workshop | Workshop |
Outputdifferent | Rich Picture, Problem Framing Notes | Expectation Map, Alignment Notes, Agreements | Interaction Heat Map, Agreements per Pair | Team Charter, Working Norms, Role Notes |
Tagsno overlap | Systems thinkingSoft systemsFramingVisualization | AlignmentStakeholdersTeam | TeamAlignmentCollaborationOrganization | TeamAlignmentCollaboration |



