View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Systems Thinking Rich Picture | ![]() Facilitation Expectation Mapping | ![]() Facilitation Stakeholder Salience Model | ![]() Facilitation Power Interest Grid |
|---|---|---|---|---|
Purposedifferent | A Rich Picture brings an unclear situation onto a shared drawing. It captures actors, tensions, information flows, and blind spots before the team jumps to solutions too early. | When roles, interfaces, or projects fail because of differing expectations, Expectation Mapping surfaces these differences. It shows what each side takes for granted and where the pictures diverge. | When stakeholders appear to matter very differently, the Stakeholder Salience Model rates their actual priority through power, legitimacy, and urgency. It turns individual contributions into a visible selection. The result is captured as a Salience diagram and a class-based strategy. | When many stakeholders compete for attention at once, the Power Interest Grid sorts them by influence and stake. It turns individual contributions into a visible selection. The result is captured as a Power Interest Grid and a stakeholder-specific strategy. |
Complexitydifferent | Low | Low | Medium | Low |
Timedifferent | 30-90 min | 45-90 min | 60-90 min | 30-60 min |
Participantsdifferent | 2-10 | 3-12 | 3-6 | 2-8 |
Formatsame | Workshop | Workshop | Workshop | Workshop |
Outputdifferent | Rich Picture, Problem Framing Notes | Expectation Map, Alignment Notes, Agreements | Salience Diagram, Strategy per Class | Power Interest Grid, Strategy per Stakeholder |
Tagsno overlap | Systems thinkingSoft systemsFramingVisualization | AlignmentStakeholdersTeam | StakeholdersFacilitationAlignmentGovernance | StakeholdersFacilitationAlignmentPlanning |



