methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Rich Picture workspace showing the question, observations, and next decision.
Systems Thinking
Rich Picture
Paper illustration for Constraint Analysis.
Decision Making
Constraint Analysis
A hypothetical failure makes concrete risks, signals, and fitting mitigations visible.
Decision Making
Pre-Mortem
Paper illustration for Current Reality Tree
Systems Thinking
Current Reality Tree
Purposedifferent
A Rich Picture brings an unclear situation onto a shared drawing. It captures actors, tensions, information flows, and blind spots before the team jumps to solutions too early.When an initiative stalls, the limit often lies not in the idea but in hard or soft boundary conditions. Constraint Analysis separates these limits and shows which of them can actually be shaped.In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures.A Current Reality Tree condenses many symptoms into a few causal chains. The method makes visible which core problems drive several negative effects at once.
Complexitydifferent
LowLowLowHigh
Timedifferent
30-90 min30-90 min20–45 min2-6 h
Participantsdifferent
2-102-8Small cross-functional group3-8
Formatdifferent
WorkshopWorkshop + asyncWorkshopWorkshop
Outputdifferent
Rich Picture, Problem Framing NotesConstraint List, Hard/Soft Classification, Option Impact Notes, Decision BoundariesRisk list, Mitigation plan, Assumption logCurrent Reality Tree, Core Problems, Intervention Ideas
Tagsno overlap
Systems thinkingSoft systemsFramingVisualization
ConstraintsDecisionPlanningOptions
RiskDecisionFailurePlanning
Systems thinkingRoot causeConstraintsCausality
Add more methods