View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Systems Thinking Rich Picture | ![]() Architecture C4 Model | ![]() Facilitation Power Interest Grid | ![]() Delivery Communication Plan |
|---|---|---|---|---|
Purposedifferent | A Rich Picture brings an unclear situation onto a shared drawing. It captures actors, tensions, information flows, and blind spots before the team jumps to solutions too early. | The C4 Model makes a system legible across several resolution levels, from context down to code. It suits situations where different audiences need to understand the same architecture from different altitudes. | When many stakeholders compete for attention at once, the Power Interest Grid sorts them by influence and stake. It turns individual contributions into a visible selection. The result is captured as a Power Interest Grid and a stakeholder-specific strategy. | When many people need to be informed in parallel and messages would otherwise arrive unevenly or too late, a Communication Plan orders communication reliably. Channels, audiences, and cadences interlock so important information doesn't get lost. |
Complexitysame | Low | Low | Low | Low |
Timedifferent | 30-90 min | 1-4 h | 30-60 min | 45-90 min |
Participantsdifferent | 2-10 | 1-5 | 2-8 | 2-6 |
Formatdifferent | Workshop | Workshop + async | Workshop | Workshop + async |
Outputdifferent | Rich Picture, Problem Framing Notes | Context Diagram, Container Diagram, Component Diagram | Power Interest Grid, Strategy per Stakeholder | Communication Plan, Channel Matrix, Message Cadence |
Tagsno overlap | Systems thinkingSoft systemsFramingVisualization | ArchitectureCommunicationVisualization | StakeholdersFacilitationAlignmentPlanning | CommunicationStakeholdersDeliveryPlanning |



