methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of a scoring table with four factor columns, a calculator and three ordered initiative cards.
Product Strategy
RICE Scoring
Paper illustration of two considered options leading to a decision record with a marked status and visible consequences.
Architecture
Architecture Decision Record
Paper illustration of RAID Log with a method-specific labelled workspace.
Delivery
RAID Log
Views and Beyond method illustration showing its working structure
Architecture
Views and Beyond
Purposedifferent
When many initiatives compete for the same resources, it brings reach, impact, confidence, and effort into one shared ranking. It makes prioritization economically connectable.An ADR permanently records an architecture decision with context, trade-offs, and consequence. It creates continuity for later changes because the decision path stays traceable.Helps clarify scope, sequence, and delivery flow in concrete terms. It makes work, boundaries, and order steerable. The result is captured as a RAID Log and a source for status reporting.Views and Beyond organizes architecture into several views so no single diagram has to do everything at once. This makes it possible to choose the representation that fits the stakeholder's question.
Complexitydifferent
MediumLowLowMedium
Timedifferent
60-90 min15-45 min30 min Setup, dann laufend1-3 Tage
Participantsdifferent
2-101-31-3 maintaining, briefing for everyone1-4
Formatdifferent
Workshop + asyncAsyncAsyncWorkshop + async
Outputdifferent
RICE Scores, Ranked List, Assumption LogADR File, Decision Log, RationaleRAID Log, Status Report SourceArchitecture Views, Cross-view Notes, Rationale
Tagsno overlap
PrioritizationScoringRoadmapTradeoffs
ArchitectureRationaleDocumentationGovernance
RiskTrackingStakeholdersGovernance
DocumentationStakeholdersArchitecture
Add more methods