methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Responsibility Poker.
Facilitation
Responsibility Poker
Paper illustration: scenarios and architectural decisions are connected to identified risks.
Architecture
ATAM (Architecture Tradeoff Analysis Method)
Paper illustration of RAID Log with a method-specific labelled workspace.
Delivery
RAID Log
Paper illustration of Stakeholder Salience Model with its method-specific working model.
Facilitation
Stakeholder Salience Model
Purposedifferent
When it stays unclear who carries responsibility and who only contributes, Responsibility Poker makes the distribution of responsibility explicit. It sharpens the boundaries between weighing in, deciding, and bearing consequences.ATAM helps teams weigh architecture decisions when quality goals compete. The team considers business goals, stakeholder expectations, and technical decisions together. The evaluation shows which risks need further investigation.Helps clarify scope, sequence, and delivery flow in concrete terms. It makes work, boundaries, and order steerable. The result is captured as a RAID Log and a source for status reporting.When stakeholders appear to matter very differently, the Stakeholder Salience Model rates their actual priority through power, legitimacy, and urgency. It turns individual contributions into a visible selection. The result is captured as a Salience diagram and a class-based strategy.
Complexitydifferent
LowHighLowMedium
Timedifferent
45-90 minSeveral meetings plus preparation and analysis; total effort depends on scope30 min Setup, dann laufend60-90 min
Participantsdifferent
3-10Evaluation team, architects, and relevant stakeholders1-3 maintaining, briefing for everyone3-6
Formatdifferent
WorkshopWorkshop + asyncAsyncWorkshop
Outputdifferent
Responsibility Map, Role Agreements, Open QuestionsPrioritized quality scenarios in a utility tree, Architecture risks with reasoning and assumptions, Sensitivity and trade-off points, Findings report with open investigationsRAID Log, Status Report SourceSalience Diagram, Strategy per Class
Tagsno overlap
RolesResponsibilityTeamFacilitation
ArchitectureQualityRiskTradeoffsStakeholders
RiskTrackingStakeholdersGovernance
StakeholdersFacilitationAlignmentGovernance
Add more methods