methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of RAID Log with a method-specific labelled workspace.
Delivery
RAID Log
Paper illustration for Risk Storming.
Architecture
Risk Storming
Paper illustration: scenarios and architectural decisions are connected to identified risks.
Architecture
ATAM (Architecture Tradeoff Analysis Method)
Design sheets and interface cards connect to jointly written pseudocode with highlighted unresolved questions.
Architecture
ARID (Active Reviews for Intermediate Designs)
Purposedifferent
Helps clarify scope, sequence, and delivery flow in concrete terms. It makes work, boundaries, and order steerable. The result is captured as a RAID Log and a source for status reporting.Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog.ATAM helps teams weigh architecture decisions when quality goals compete. The team considers business goals, stakeholder expectations, and technical decisions together. The evaluation shows which risks need further investigation.ARID examines how well developers can work with a technical design. It focuses on a part of the system that can still be revised, between the architecture overview and the detailed specification.
Complexitydifferent
LowLowHighMedium
Timedifferent
30 min Setup, dann laufend60-90 minSeveral meetings plus preparation and analysis; total effort depends on scope2–4 h review as a planning range; preparation and evaluation additional
Participantsdifferent
1-3 maintaining, briefing for everyone4-12Evaluation team, architects, and relevant stakeholdersDesigners, developers as users, and facilitation
Formatdifferent
AsyncWorkshopWorkshop + asyncWorkshop + async
Outputdifferent
RAID Log, Status Report SourceAnnotated Diagram, Prioritized Risk List, Action BacklogPrioritized quality scenarios in a utility tree, Architecture risks with reasoning and assumptions, Sensitivity and trade-off points, Findings report with open investigationsPrioritized development tasks, Jointly produced code or pseudocode, Observed difficulties and open design questions, Proposed design revisions
Tagsno overlap
RiskTrackingStakeholdersGovernance
RiskArchitectureWorkshopValidation
ArchitectureQualityRiskTradeoffsStakeholders
ArchitectureEngineeringFeedbackValidationTasks
Add more methods