methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of RAID Log with a method-specific labelled workspace.
Delivery
RAID Log
Paper illustration of a calibrated five-by-five risk matrix with response cards.
Decision Making
Risk Matrix
Views and Beyond method illustration showing its working structure
Architecture
Views and Beyond
Paper illustration: scenarios and architectural decisions are connected to identified risks.
Architecture
ATAM (Architecture Tradeoff Analysis Method)
Purposedifferent
Helps clarify scope, sequence, and delivery flow in concrete terms. It makes work, boundaries, and order steerable. The result is captured as a RAID Log and a source for status reporting.When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List.Views and Beyond organizes architecture into several views so no single diagram has to do everything at once. This makes it possible to choose the representation that fits the stakeholder's question.ATAM helps teams weigh architecture decisions when quality goals compete. The team considers business goals, stakeholder expectations, and technical decisions together. The evaluation shows which risks need further investigation.
Complexitydifferent
LowLowMediumHigh
Timedifferent
30 min Setup, dann laufend30-60 min1-3 TageSeveral meetings plus preparation and analysis; total effort depends on scope
Participantsdifferent
1-3 maintaining, briefing for everyone3-101-4Evaluation team, architects, and relevant stakeholders
Formatdifferent
AsyncWorkshop + asyncWorkshop + asyncWorkshop + async
Outputdifferent
RAID Log, Status Report SourceRisk Matrix, Top Risk ListArchitecture Views, Cross-view Notes, RationalePrioritized quality scenarios in a utility tree, Architecture risks with reasoning and assumptions, Sensitivity and trade-off points, Findings report with open investigations
Tagsno overlap
RiskTrackingStakeholdersGovernance
RiskDecisionPrioritizationAssessment
DocumentationStakeholdersArchitecture
ArchitectureQualityRiskTradeoffsStakeholders
Add more methods