methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of RAID Log with a method-specific labelled workspace.
Delivery
RAID Log
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Paper illustration for Alignment Mapping.
Facilitation
Alignment Mapping
Paper illustration of Power-Interest Grid with a method-specific labelled workspace.
Facilitation
Power Interest Grid
Purposedifferent
Helps clarify scope, sequence, and delivery flow in concrete terms. It makes work, boundaries, and order steerable. The result is captured as a RAID Log and a source for status reporting.When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.When several people work toward one goal but hold different mental maps, Alignment Mapping makes the discrepancies visible. It arranges goals, assumptions, and priorities so shared direction becomes verifiable.When many stakeholders compete for attention at once, the Power Interest Grid sorts them by influence and stake. It turns individual contributions into a visible selection. The result is captured as a Power Interest Grid and a stakeholder-specific strategy.
Complexitydifferent
LowMediumMediumLow
Timedifferent
30 min Setup, dann laufendOngoing1-2 h30-60 min
Participantsdifferent
1-3 maintaining, briefing for everyone2-124-122-8
Formatdifferent
AsyncWorkshop + asyncWorkshopWorkshop
Outputdifferent
RAID Log, Status Report SourceKanban board, WIP policies, Flow metricsAlignment Map, Open Issues, Decision QuestionsPower Interest Grid, Strategy per Stakeholder
Tagsno overlap
RiskTrackingStakeholdersGovernance
FlowVisual managementDelivery
AlignmentStakeholdersStrategyFacilitation
StakeholdersFacilitationAlignmentPlanning
Add more methods