View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Delivery RAID Log | ![]() Engineering Fault Isolation | ![]() Facilitation Power Interest Grid | ![]() Agile ROAM Board |
|---|---|---|---|---|
Purposedifferent | Helps clarify scope, sequence, and delivery flow in concrete terms. It makes work, boundaries, and order steerable. The result is captured as a RAID Log and a source for status reporting. | In technical failures, the visible symptom often gets mixed up with the actual cause. Fault Isolation narrows the fault space and progressively reduces which part of the system is truly affected. | When many stakeholders compete for attention at once, the Power Interest Grid sorts them by influence and stake. It turns individual contributions into a visible selection. The result is captured as a Power Interest Grid and a stakeholder-specific strategy. | When work needs to move between different states or columns, it makes that movement and its handoffs legible. It sorts work by value, risk, and delivery ability. The result is captured as a ROAM Board and an Owner List. |
Complexitydifferent | Low | Medium | Low | Low |
Timedifferent | 30 min Setup, dann laufend | 30-180 min | 30-60 min | 20-40 min initial, dann laufend |
Participantsdifferent | 1-3 maintaining, briefing for everyone | 1-6 | 2-8 | 3-15 |
Formatdifferent | Async | Workshop + async | Workshop | Workshop + async |
Outputdifferent | RAID Log, Status Report Source | Fault Isolation Map, Test Log, Excluded Hypotheses, Narrowed Fault Area | Power Interest Grid, Strategy per Stakeholder | ROAM Board, Owner List |
Tagsno overlap | RiskTrackingStakeholdersGovernance | TroubleshootingDiagnosisEngineering | StakeholdersFacilitationAlignmentPlanning | RiskAgileTrackingAlignment |



