View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Delivery RAID Log | ![]() Innovation Design Sprint | ![]() UX Research Surveys | ![]() Architecture ATAM (Architecture Tradeoff Analysis Method) |
|---|---|---|---|---|
Purposedifferent | Helps clarify scope, sequence, and delivery flow in concrete terms. It makes work, boundaries, and order steerable. The result is captured as a RAID Log and a source for status reporting. | When the product question is unclear and time pressure is high, the method takes a team from an open idea to a testable solution. It connects problem understanding, decision, and learning in one compact format, lowering the risk of spending a lot of energy on a mere guess. | When a topic needs to be validated broadly and many people can answer the same question, surveys gather structured feedback in a scalable form. Answers become comparable and segmentable instead of remaining merely anecdotal. | ATAM helps teams weigh architecture decisions when quality goals compete. The team considers business goals, stakeholder expectations, and technical decisions together. The evaluation shows which risks need further investigation. |
Complexitydifferent | Low | High | Medium | High |
Timedifferent | 30 min Setup, dann laufend | 4-5 Tage | 3-14 Tage | Several meetings plus preparation and analysis; total effort depends on scope |
Participantsdifferent | 1-3 maintaining, briefing for everyone | 5-8 | 50+ | Evaluation team, architects, and relevant stakeholders |
Formatdifferent | Async | Workshop | Async | Workshop + async |
Outputdifferent | RAID Log, Status Report Source | Prototype, Test Findings, Decision Rationale | Survey Results, Charts, Segment Insights | Prioritized quality scenarios in a utility tree, Architecture risks with reasoning and assumptions, Sensitivity and trade-off points, Findings report with open investigations |
Tagsno overlap | RiskTrackingStakeholdersGovernance | Design sprintPrototypeValidationInnovation | QuantitativeResearchValidation | ArchitectureQualityRiskTradeoffsStakeholders |



