Criterion
Paper illustration of RAID Log with a method-specific labelled workspace.
Delivery
RAID Log
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
A hypothetical failure makes concrete risks, signals, and fitting mitigations visible.
Decision Making
Pre-Mortem
Paper illustration for Constraint Analysis.
Decision Making
Constraint Analysis
Purposedifferent
Helps clarify scope, sequence, and delivery flow in concrete terms. It makes work, boundaries, and order steerable. The result is captured as a RAID Log and a source for status reporting.Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures.When an initiative stalls, the limit often lies not in the idea but in hard or soft boundary conditions. Constraint Analysis separates these limits and shows which of them can actually be shaped.
Complexitydifferent
LowHighLowLow
Timedifferent
30 min Setup, dann laufend90-180 min20–45 min30-90 min
Participantsdifferent
1-3 maintaining, briefing for everyone3-8Small cross-functional group2-8
Formatdifferent
AsyncWorkshopWorkshopWorkshop + async
Outputdifferent
RAID Log, Status Report SourceCoD Table, Prioritization SequenceRisk list, Mitigation plan, Assumption logConstraint List, Hard/Soft Classification, Option Impact Notes, Decision Boundaries
Tagsno overlap
RiskTrackingStakeholdersGovernance
PrioritizationDeliveryEconomicsDecision
RiskDecisionFailurePlanning
ConstraintsDecisionPlanningOptions