View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Delivery RAID Log | ![]() Delivery Cost of Delay | ![]() Operations ABC Analysis | ![]() Decision Making Assumption Surfacing |
|---|---|---|---|---|
Purposedifferent | Helps clarify scope, sequence, and delivery flow in concrete terms. It makes work, boundaries, and order steerable. The result is captured as a RAID Log and a source for status reporting. | Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence. | With many similar objects of differing economic significance, the method prioritizes effort by effect. It separates what needs regular steering from what rarely needs attention. | Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it. |
Complexitydifferent | Low | High | Low | Low |
Timedifferent | 30 min Setup, dann laufend | 90-180 min | 30-60 min | 45-90 min |
Participantsdifferent | 1-3 maintaining, briefing for everyone | 3-8 | 1-5 | 2-8 |
Formatdifferent | Async | Workshop | Async | Workshop + async |
Outputdifferent | RAID Log, Status Report Source | CoD Table, Prioritization Sequence | ABC Classification, Focus Rules, Control List | Assumption List, Critical Assumptions, Learning Plan |
Tagsno overlap | RiskTrackingStakeholdersGovernance | PrioritizationDeliveryEconomicsDecision | PrioritizationOperationsPortfolio | AssumptionsRiskDecisionDiscovery |



