methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of RAID Log with a method-specific labelled workspace.
Delivery
RAID Log
Paper illustration: scenarios and architectural decisions are connected to identified risks.
Architecture
ATAM (Architecture Tradeoff Analysis Method)
Paper illustration of Barrier Analysis with its method-specific working model.
Operations
Barrier Analysis
Paper illustration of MORT Analysis with its method-specific working model.
Operations
MORT Analysis
Purposedifferent
Helps clarify scope, sequence, and delivery flow in concrete terms. It makes work, boundaries, and order steerable. The result is captured as a RAID Log and a source for status reporting.ATAM helps teams weigh architecture decisions when quality goals compete. The team considers business goals, stakeholder expectations, and technical decisions together. The evaluation shows which risks need further investigation.For a risk that can only be managed through multiple layers of protection, the method examines the effectiveness of each barrier. It shows where safeguards are missing, too weak, or fail under real conditions.For a safety-relevant event or a system with high protection requirements, the method examines where controls failed. It exposes both technical and organizational gaps.
Complexitydifferent
LowHighMediumHigh
Timedifferent
30 min Setup, dann laufendSeveral meetings plus preparation and analysis; total effort depends on scope2-4 hMehrere Tage bis Wochen
Participantsdifferent
1-3 maintaining, briefing for everyoneEvaluation team, architects, and relevant stakeholders2-62-6
Formatdifferent
AsyncWorkshop + asyncWorkshop + asyncWorkshop + async
Outputdifferent
RAID Log, Status Report SourcePrioritized quality scenarios in a utility tree, Architecture risks with reasoning and assumptions, Sensitivity and trade-off points, Findings report with open investigationsBarrier Inventory, Failure Analysis per Barrier, Action BacklogMORT Worksheets, Findings per Branch, Corrective Actions, Systemic Recommendations
Tagsno overlap
RiskTrackingStakeholdersGovernance
ArchitectureQualityRiskTradeoffsStakeholders
Root causeSafetyIncident
Root causeSafetySystemicIncident
Add more methods