methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of RAID Log with a method-specific labelled workspace.
Delivery
RAID Log
Paper illustration: scenarios and architectural decisions are connected to identified risks.
Architecture
ATAM (Architecture Tradeoff Analysis Method)
Paper illustration for Alignment Mapping.
Facilitation
Alignment Mapping
Paper illustration of Power-Interest Grid with a method-specific labelled workspace.
Facilitation
Power Interest Grid
Purposedifferent
Helps clarify scope, sequence, and delivery flow in concrete terms. It makes work, boundaries, and order steerable. The result is captured as a RAID Log and a source for status reporting.ATAM helps teams weigh architecture decisions when quality goals compete. The team considers business goals, stakeholder expectations, and technical decisions together. The evaluation shows which risks need further investigation.When several people work toward one goal but hold different mental maps, Alignment Mapping makes the discrepancies visible. It arranges goals, assumptions, and priorities so shared direction becomes verifiable.When many stakeholders compete for attention at once, the Power Interest Grid sorts them by influence and stake. It turns individual contributions into a visible selection. The result is captured as a Power Interest Grid and a stakeholder-specific strategy.
Complexitydifferent
LowHighMediumLow
Timedifferent
30 min Setup, dann laufendSeveral meetings plus preparation and analysis; total effort depends on scope1-2 h30-60 min
Participantsdifferent
1-3 maintaining, briefing for everyoneEvaluation team, architects, and relevant stakeholders4-122-8
Formatdifferent
AsyncWorkshop + asyncWorkshopWorkshop
Outputdifferent
RAID Log, Status Report SourcePrioritized quality scenarios in a utility tree, Architecture risks with reasoning and assumptions, Sensitivity and trade-off points, Findings report with open investigationsAlignment Map, Open Issues, Decision QuestionsPower Interest Grid, Strategy per Stakeholder
Tags1 shared
RiskTrackingStakeholdersGovernance
ArchitectureQualityRiskTradeoffsStakeholders
AlignmentStakeholdersStrategyFacilitation
StakeholdersFacilitationAlignmentPlanning
Add more methods