View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Delivery RAID Log | ![]() Product Discovery Assumption Mapping | ![]() Innovation Design Sprint | ![]() Decision Making Assumption Surfacing |
|---|---|---|---|---|
Purposedifferent | Helps clarify scope, sequence, and delivery flow in concrete terms. It makes work, boundaries, and order steerable. The result is captured as a RAID Log and a source for status reporting. | When assumptions still sit unordered in the room, it weighs uncertainty against leverage. It makes visible which hypotheses should be checked first. | When the product question is unclear and time pressure is high, the method takes a team from an open idea to a testable solution. It connects problem understanding, decision, and learning in one compact format, lowering the risk of spending a lot of energy on a mere guess. | Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it. |
Complexitydifferent | Low | Medium | High | Low |
Timedifferent | 30 min Setup, dann laufend | 45-60 min | 4-5 Tage | 45-90 min |
Participantsdifferent | 1-3 maintaining, briefing for everyone | 2-8 | 5-8 | 2-8 |
Formatdifferent | Async | Workshop + async | Workshop | Workshop + async |
Outputdifferent | RAID Log, Status Report Source | Assumption map, Test backlog, Risk ranking | Prototype, Test Findings, Decision Rationale | Assumption List, Critical Assumptions, Learning Plan |
Tagsno overlap | RiskTrackingStakeholdersGovernance | AssumptionsRiskExperimentsValidation | Design sprintPrototypeValidationInnovation | AssumptionsRiskDecisionDiscovery |



