methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of RAID Log with a method-specific labelled workspace.
Delivery
RAID Log
Paper illustration for ALPEN Method
Operations
ALPEN Method
A3 Problem-Solving workspace showing the question, observations, and next decision.
Operations
A3 Problem Solving
Paper illustration: scenarios and architectural decisions are connected to identified risks.
Architecture
ATAM (Architecture Tradeoff Analysis Method)
Purposedifferent
Helps clarify scope, sequence, and delivery flow in concrete terms. It makes work, boundaries, and order steerable. The result is captured as a RAID Log and a source for status reporting.With an overloaded day full of too many tasks, a realistic picture of the day emerges. The method connects estimating, deciding, and buffer thinking so planning fits available energy and time.For a complex deviation with several people involved, the method bundles problem, analysis, and decision onto one page. It creates a shared working space where causes, countermeasures, and follow-up fit together.ATAM helps teams weigh architecture decisions when quality goals compete. The team considers business goals, stakeholder expectations, and technical decisions together. The evaluation shows which risks need further investigation.
Complexitydifferent
LowLowMediumHigh
Timedifferent
30 min Setup, dann laufend10-20 min daily45-90 minSeveral meetings plus preparation and analysis; total effort depends on scope
Participantsdifferent
1-3 maintaining, briefing for everyone12-5Evaluation team, architects, and relevant stakeholders
Formatdifferent
AsyncAsyncWorkshop + asyncWorkshop + async
Outputdifferent
RAID Log, Status Report SourceDaily Plan, Time Estimates, Review NotesA3 Report, Action Plan, Root Cause AnalysisPrioritized quality scenarios in a utility tree, Architecture risks with reasoning and assumptions, Sensitivity and trade-off points, Findings report with open investigations
Tagsno overlap
RiskTrackingStakeholdersGovernance
PlanningTime managementProductivityOperations
LeanProblem solvingCoachingOperations
ArchitectureQualityRiskTradeoffsStakeholders
Add more methods