methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of RAID Log with a method-specific labelled workspace.
Delivery
RAID Log
Paper illustration for ABC Analysis
Operations
ABC Analysis
Paper illustration of a calibrated five-by-five risk matrix with response cards.
Decision Making
Risk Matrix
Paper illustration of an assumption matrix with prioritized test cards
Decision Making
Assumption Surfacing
Purposedifferent
Helps clarify scope, sequence, and delivery flow in concrete terms. It makes work, boundaries, and order steerable. The result is captured as a RAID Log and a source for status reporting.With many similar objects of differing economic significance, the method prioritizes effort by effect. It separates what needs regular steering from what rarely needs attention.When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List.Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it.
Complexitysame
LowLowLowLow
Timedifferent
30 min Setup, dann laufend30-60 min30-60 min45-90 min
Participantsdifferent
1-3 maintaining, briefing for everyone1-53-102-8
Formatdifferent
AsyncAsyncWorkshop + asyncWorkshop + async
Outputdifferent
RAID Log, Status Report SourceABC Classification, Focus Rules, Control ListRisk Matrix, Top Risk ListAssumption List, Critical Assumptions, Learning Plan
Tagsno overlap
RiskTrackingStakeholdersGovernance
PrioritizationOperationsPortfolio
RiskDecisionPrioritizationAssessment
AssumptionsRiskDecisionDiscovery
Add more methods