methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of RAID Log with a method-specific labelled workspace.
Delivery
RAID Log
A/B Testing workspace showing the question, observations, and next decision.
Growth
A/B Testing
Paper illustration: scenarios and architectural decisions are connected to identified risks.
Architecture
ATAM (Architecture Tradeoff Analysis Method)
Paper illustration for Risk Storming.
Architecture
Risk Storming
Purposedifferent
Helps clarify scope, sequence, and delivery flow in concrete terms. It makes work, boundaries, and order steerable. The result is captured as a RAID Log and a source for status reporting.When two variants compete, discussions quickly decide by taste rather than effect. A/B Testing checks behavior under controlled conditions and separates real improvement from chance or expectation effects.ATAM helps teams weigh architecture decisions when quality goals compete. The team considers business goals, stakeholder expectations, and technical decisions together. The evaluation shows which risks need further investigation.Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog.
Complexitydifferent
LowHighHighLow
Timedifferent
30 min Setup, dann laufend1-4 WochenSeveral meetings plus preparation and analysis; total effort depends on scope60-90 min
Participantsdifferent
1-3 maintaining, briefing for everyone1-6Evaluation team, architects, and relevant stakeholders4-12
Formatdifferent
AsyncAsyncWorkshop + asyncWorkshop
Outputdifferent
RAID Log, Status Report SourceExperiment results, Decision log, Learning summaryPrioritized quality scenarios in a utility tree, Architecture risks with reasoning and assumptions, Sensitivity and trade-off points, Findings report with open investigationsAnnotated Diagram, Prioritized Risk List, Action Backlog
Tagsno overlap
RiskTrackingStakeholdersGovernance
ExperimentsGrowthAnalyticsValidation
ArchitectureQualityRiskTradeoffsStakeholders
RiskArchitectureWorkshopValidation
Add more methods